Two data centers can each reach a 100 megawatt peak while using very different amounts of electricity over a year. Load factor tells you how their average demand compares with that peak. You can use it to estimate annual energy use once you know what the meter covers.
The peak and the average need the same meter
A megawatt, or MW, measures power. A megawatt-hour, or MWh, measures energy over time. The U.S. Energy Information Administration’s guide to measuring electricity shows how time makes the difference. Draw 100 MW for one hour and you use 100 MWh. Draw it for half an hour and you use 50 MWh.
Peak demand is the highest reading for the period, under the meter’s rules. Average demand is the energy the site used, divided by the hours in that period. The California Energy Commission’s glossary calls the ratio of actual use to continuous use at the measured peak the load factor. Use a monthly peak for a monthly load factor and an annual peak for an annual one.
Check where the meter sits. A reading at the utility connection may include pumps, fans and other systems, while an IT meter may count only the computing gear. Our guide to why AI uses so much electricity looks at those other loads. Use the same boundary for both parts of the ratio.
Worked example: 100 MW to annual MWh
Assume a site reaches a measured 100 MW peak at its facility meter during a 365-day year. That year has 8,760 hours. Compare two load factors with the same peak and the same hours. These numbers illustrate the math. They come from no actual site.
70% load factor. The site draws 70 MW on average. Multiply 100 MW × 8,760 hours × 0.70 to get 613,200 MWh, or 613.2 GWh.
85% load factor. The site draws 85 MW on average. Multiply 100 MW × 8,760 hours × 0.85 to get 744,600 MWh, or 744.6 GWh.
The difference is 131,400 MWh, even though the sites reach the same top reading. A peak-only chart would miss the gap. A known annual bill with energy in MWh lets you run the formula backward. Divide the MWh by both the peak and the number of hours.

What changes when the site opens in phases
Count the hours the estimate covers. If the site runs for 180 days, that is 4,320 hours. A 100 MW peak with an assumed 70% load factor across just those operating days gives 302,400 MWh. To calculate a load factor for the full calendar year, include the earlier hours and any earlier consumption as well.
For a campus that opens one hall at a time, estimate each stage separately and add its energy. Avoid adding peaks from different meters unless you know they occur at the same time. If all you have is a utility contract or a design limit, label it as a capacity assumption. Then show the range of results at different load factors. To report use as measured, look for meter totals or a utility record that gives the energy over a stated period.
A forecast can use contract capacity as an explicit assumption. When you are checking a real site, use the grid connection milestones to see whether the utility has agreed to serve that load.
Read also
Popular news

Soitec jumps 6.9% as European chip stocks rebound and Eutelsat falls

Ant Group releases a design image model that tops the open-weight ranking

Kioxia jumps 12.6% as Asian AI stocks trade through Thanksgiving

Perplexity lets developers search the web as it looked on an earlier date

AI sends more shoppers to retail sites ahead of Black Friday